OEE with Schedules
This approach captures the use case of handling production via a schedule.
This section is independent and contains its own setup and configuration pages, allowing students to train only on this section if they choose, without being required to perform prerequisite tasks from other sections (after initial Ignition and database installation/configuration).
Get Set Up First!
|
Before proceeding, complete the Getting Set Up section to get Ignition and your database installed and configured. |
- OEE:SCH: Configure Equipment
- OEE:SCH: Configure Tags
- OEE:SCH: Configure Equipment Manager
- OEE:SCH: Configure Material Manager
- OEE:SCH: Configure Schedule Manager
- OEE:SCH: Add States, Modes, Materials and Shifts
- OEE:SCH: Configure Scheduling
- OEE:SCH: Add Work Orders and Schedule Entries
- OEE:SCH: Configure Impromptu Analysis
- OEE:SCH: Create Several Analyses
- OEE:SCH: Configure Ignition Reporting
- OEE:SCH: Prepare a Line Report